roof getting installed into the building. elevator walls getting done as well.
the month of april was hectic. getting architectural stuff finalized, selling Yellow Ginger Cuisine and officially closing it in april. moved to half moon bay for a closer commute as gas was 4.95 / gallon at the time. fell in love with the coast side. still waiting for the shell to be done and handed over to us so we could start interior construction.
No comments:
Post a Comment