more and more construction. Glass railings on the upper level dining was getting installed, bars being built, staircase wielding, murals on the walls were getting complete, painted the floors on the patio, elevators getting installed. still so much more to be done. crazy but fun times.
problems that didnt need to happen but happened anyways:
patio was painted one color and an idiot decides to buy a different kind to paint the rest of the patio so we had to diff shades on the patio floors.
sealing the patio after paint was an even worse disaster. not done right and everything started chipping off.
ALL FIXED THOUGH!
elevator getting installed
upstairs bar being built
scaffold to complete the walls for the kitchen and where the rest of the
mural would be
the platform 45 ft in the air. not cool to climb up n down.
nice lil host stand
patio floors. as u can see theres 2 diff shades of paint color